Roadmap¶
A design target, not a delivery time
The times on this page are a target for the whole compute fleet, agreed as a direction on 9 November 2026. The times to plan against are in the forecast schedule and the data gateway commitment. The mosaic and the Nepal, Central Asia and Kazakhstan boards are moving to the 9 km input now (17 November 2026); the mosaic forecast commitment becomes init + 12 h.
Target pipeline: one fetch per cycle, all domains together¶
Each input is downloaded and decoded once, as soon as ECMWF releases it. Every domain (≈ 36 000 units for the mosaic's three, ≈ 78 000 across High Mountain Asia) is then downscaled and modelled in parallel from saved snowpack states, and results go to S3 and the dashboards. The same chain repeats for 12Z. Downscaling and FSM take minutes; decoding the 9 km cycle and building dashboards take the time.
| UTC | Step | Notes |
|---|---|---|
| 05:00 | Reanalysis update, all domains. ERA5 to the reanalysis cut, FSM at 3 h, snowpack state saved at the cut for every domain. Mosaic reanalysis day-files published. | Daily. Removes Kazakhstan's run from 1 Sep each cycle and the Central Asia weekly cut. |
| 07:40 | 0.25° ensemble released, fetched once; ensemble runs for all domains. | ≈ 1 h; finishes before the 9 km deterministic arrives. Not published to S3. |
| 09:35 | 9 km deterministic released (5-min poll), downloaded and decoded once: 2 min download, 5–15 min decode. | The step that sets the pace; release time to be measured. |
| ≈ 09:50 | TPS2 + FSM for all domains in parallel, warm-started from the 05:00 states. | Seconds per 10 000 units for downscaling, 1–2 min per domain for FSM. |
| ≈ 10:00 | Publish: mosaic forecast and domain products to S3, results into the common layout. | |
| 10:00–11:00 | Dashboards (00Z), parallel tiles, incremental. | |
| 21:35 | 12Z released, same chain, S3 ≈ 22:00; dashboards refresh the forecast panels only. | Ready before the working day in Nepal (03:45 NPT) and Central Asia (04:00 KGT). |
What it needs¶
| Piece | What it does |
|---|---|
| Shared input store | 9 km deterministic, ensemble and ERA5, each fetched and decoded once (architecture steps 1 and 3; step 0 first). |
| One release-driven scheduler | Replaces about 15 per-domain cron lines and sets the run order: deterministic first, then ensembles, then dashboards. First step taken on 17 November 2026: Nepal, Central Asia and Kazakhstan now start on each ECMWF release. |
| Daily saved states | Each cycle only simulates the window from the reanalysis cut to +240 h. |
| Incremental dashboards | A full rebuild twice a day does not fit every board; the 12Z rebuild would re-render the forecast panels only. |
| Common results layout | Mosaic export, domain pushes and dashboards all read from it. |
| First piece: the mosaic cycle job | Built as this pipeline for Nepal, Central Asia and Kazakhstan; Hindu Kush, Afghanistan, Kyrgyzstan and Jyrgalan join it and their crons retire. |
Dependencies on the compute architecture¶
The mosaic service is the first downstream job of the planned common results layer. Until the scheduler exists it reruns FSM at 3 h and runs its own 12Z downscaling.
- Decode once (step 3). A 9 km cycle takes 13–16 min to decode. Three domains decoding it separately is 3× the CPU and memory; with one shared decode the mosaic is out about 25–35 min after release.
- Stop re-decoding archived cycles (step 0). Today a 9 km consumer re-decodes 2–3 older cycles per run (Kyrgyzstan 11:00–11:45 on 9 November 2026).
- Shared ENS fetch (step 1). Several ensemble runs overlap 07:30–09:30 and fetch the same files. Memory is the limit in that window.
- Run order: external deterministic products first, then ensembles, then dashboards.